论交货期设定与订单释放控制的整合

On the integration of due date setting and order release control

Production Planning and Control · 2017
被引 14
ABS 3

中文导读

本文提出将交货期设定与订单释放控制整合为单一决策层级,通过预估释放日期来减少延误,仿真验证了新方法在加工时间不确定下的稳健性。

Abstract

This paper calls for a paradigm shift in the production control literature away from assuming due date setting and order release are two independent decision levels. When order release is controlled, jobs do not enter the shop floor directly but are retained in a pre-shop pool and released to meet certain performance targets. This makes the setting of accurate planned release dates – the point at which jobs transition from the pool to the shop floor – a key consideration when setting due dates. We develop a new approach to estimating planned release dates to be embedded in the Workload Control (WLC) concept. Our approach is unique as it anticipates the release decision as part of the due date setting procedure. This makes a second independent release decision superfluous and avoids a major cause of tardiness – deviations between (i) the planned release date used when calculating the delivery time allowance and (ii) the actual, realised release date. Simulation is used to compare the performance of WLC using two decision levels with the new single-level approach where the release decision is anticipated when setting the due date. Performance improvements are shown to be robust to uncertainty in processing time estimates.

生产控制作业车间调度工作量控制运营管理