基于双智能体的单机调度问题:考虑切换时间以最小化总加权完工时间和最大完工时间目标

Two-agent-based single-machine scheduling with switchover time to minimize total weighted completion time and makespan objectives

Annals of Operations Research · 2017
被引 6
ABS 3
生产调度运筹优化智能算法作业车间调度