项目组合选择中下行风险的估计

Estimation of Downside Risks in Project Portfolio Selection

Production and Operations Management · 2017
被引 25
FT 50UTD 24ABS 4

中文导读

研究了项目组合选择中因不确定性导致的下行风险估计偏差,提出校准框架消除系统性偏差,并发现更严格的风险约束可能加剧风险低估。

Abstract

In project portfolio selection, the aim is to choose projects which are expected to offer most value and satisfy relevant risk and other constraints. In this study, we show that uncertainties about how much value the projects will offer, combined with the fact that only a subset of the proposed projects will be selected, lead to inaccurate risk estimates about the aggregate value provided by the selected project portfolio. In particular, when downside risks are measured in terms of lower percentiles of the distribution of portfolio value, these risk estimates will exhibit a systematic bias. For deriving unbiased risk estimates, we present a calibration framework in which the required calibration can be presented in closed‐form in some cases or, more generally, derived by using Monte Carlo simulation to study a large number of project selection decisions. We also show that when the decision must comply with risk constraints, the introduction of tighter (more demanding) risk constraints can counterintuitively aggravate the underestimation of risks. Finally, we present how the calibrated risk estimates can be employed to align the portfolio with the decision maker's risk preferences while eliminating systematic biases in risk estimates.

项目组合管理风险管理金融工程决策科学计量经济学