多站点生物制药生产的新批量与调度启发式方法

A new lot sizing and scheduling heuristic for multi-site biopharmaceutical production

Journal of Heuristics · 2017
被引 7
ABS 3

中文导读

针对生物制药多产品多设施的生产计划问题,提出一种遗传算法优化的构造启发式方法,能生成多年生产计划,并在某些场景下优于数学规划模型。

Abstract

Biopharmaceutical manufacturing requires high investments and long-term production planning. For large biopharmaceutical companies, planning typically involves multiple products and several production facilities. Production is usually done in batches with a substantial set-up cost and time for switching between products. The goal is to satisfy demand while minimising manufacturing, set-up and inventory costs. The resulting production planning problem is thus a variant of the capacitated lot-sizing and scheduling problem, and a complex combinatorial optimisation problem. Inspired by genetic algorithm approaches to job shop scheduling, this paper proposes a tailored construction heuristic that schedules demands of multiple products sequentially across several facilities to build a multi-year production plan (solution). The sequence in which the construction heuristic schedules the different demands is optimised by a genetic algorithm. We demonstrate the effectiveness of the approach on a biopharmaceutical lot sizing problem and compare it with a mathematical programming model from the literature. We show that the genetic algorithm can outperform the mathematical programming model for certain scenarios because the discretisation of time in mathematical programming artificially restricts the solution space.

生物制药生产计划调度优化遗传算法运筹学