潜在机器中断下的单机调度与公共交货期分配

Single-machine scheduling and common due date assignment with potential machine disruption

International Journal of Production Research · 2017
被引 30
ABS 3

中文导读

研究了机器可能发生中断时,如何同时确定最优的作业排序和公共交货期,以最小化包含提前、延误和交货期成本的期望总成本,并提出了多种求解算法。

Abstract

This paper studies a single-machine due date assignment and scheduling problem in a disruptive environment, where a machine disruption may occur at a particular time that will last for a period of time with a certain probability, and the job due dates are determined by the decision-maker using the popular common due date assignment method. The goal is to determine jointly the optimal job sequence and the common due date so as to minimise the expected value of an integrated cost function that includes the earliness, tardiness and due date assignment costs. We analyse the computational complexity status of various cases of the problem, and develop pseudo-polynomial-time solution algorithms, randomised adaptive search algorithms, and fully polynomial-time approximation schemes for them, if viable. Finally, we conduct extensive numerical testing to assess the performance of the proposed algorithms.

生产调度机器中断交货期分配优化算法