基于绩效的维护合同中技术投资效应分析

Technology investment effects in performance-based maintenance contracts

International Journal of Production Research · 2017
被引 12
ABS 3

中文导读

研究了供应商在基于绩效的维护合同中预先投资技术或基础设施的影响,通过数学模型分析投资与维护干预次数之间的权衡,并提出了收益共享机制以协调双方利益,实现供应链净现值提升149.7%。

Abstract

This work analyses the effects of a fixed initial investment in technology or infrastructure on performance-based maintenance contracts. We present a mathematical expression which reflects the trade-off between an upfront technology investment by the vendor and the cost of required future interventions. We develop a mathematical model of a performance-based maintenance contract that uses this technology trade-off expression and determines the value of the contract for each party. Contractually, the client indicates the duration of the contract and the optimal number of maintenance interventions to maximise asset availability; the vendor quotes the cost for the requested interventions. We study how the initial investment and the contract parameters affect the net present value for each party and the supply chain, demonstrating the existence of an optimal relation between the number of preventive maintenance interventions and level of investment. We derive the optimal contract parameters for the client, vendor and chain and show lack of coordination between the parties. To achieve coordination, we present a revenue sharing mechanism which maximises the value for the chain. Finally, an industry study case with data from the mining sector is presented. Results indicate that by investing and coordinating, the entire supply chain can improve the contract NPV by 149.7%.

供应链管理合同管理运营管理投资决策