优化调度相互干扰和非相互干扰的起重机

Optimally scheduling interfering and non‐interfering cranes

Naval Research Logistics · 2017
被引 10
ABS 3

中文导读

研究沿直线作业的多台起重机调度问题,提出基于Benders分解的最优算法,能在数秒或数分钟内求解中小规模甚至许多大规模实例,并改进了文献中已知的最优解。

Abstract

Abstract This article treats the problem of scheduling multiple cranes processing jobs along a line, where cranes are divided into different groups and only cranes in the same group can interfere with each other. Such crane scheduling problems occur, for example, at indented berths or in container yards where double rail‐mounted gantry cranes stack containers such that cranes of the same size can interfere with each other but small cranes can pass underneath larger ones. We propose a novel algorithm based on Benders decomposition to solve this problem to optimality. In a computational study, it is shown that this algorithm solves small and medium‐sized instances and even many large instances within a few seconds or minutes. Moreover, it improves several best known solutions from the literature with regard to the simpler problem version with only one crane group. We also look into whether investment in more complicated crane configurations with multiple crane groups is actually worthwhile.

调度优化运筹学港口物流起重机调度