模糊需求和安全库存下管理突发供应延迟的定量与仿真模型

A quantitative and simulation model for managing sudden supply delay with fuzzy demand and safety stock

International Journal of Production Research · 2017
被引 48
ABS 3

中文导读

针对突发供应延迟,开发了一个考虑模糊需求和安全库存的恢复模型,生成有限未来期的恢复计划,并通过仿真和敏感性分析验证了模型的有效性,帮助供应链决策者快速制定恢复方案。

Abstract

In this paper, a recovery model is developed for managing sudden supply delays that affect retailers’ economic order quantity model. For this, a mathematical model is developed that considers fuzzy demand and safety stock, and generates a recovery plan for a finite future period immediately after a sudden supply delay. An efficient heuristic solution is developed that generates the recovery plan after a sudden supply delay. An experiment with scenario-based analysis is conducted to test our heuristic and to analyse the results. To assess the quality and consistency of solutions, the performance of the proposed heuristic is compared with the performance of the generalised reduced gradient method, which is widely applied in constrained mathematical programming. A simulation model is also designed to bring the recovery model closer to real-world processes. Several numerical examples are presented and a sensitivity analysis is performed to demonstrate the effects of various parameters on the performance of the heuristic method. The results show that safety stock plays an important role in recovery from sudden supply delays, and there is a trade-off between backorder and lost sales costs in the recovery plan. With the help of the proposed model, supply chain decision-makers can make accurate and prompt decision regarding recovery plans in case of sudden supply delay.

供应链管理库存管理运筹学模糊逻辑