一种混合VNS-HS算法求解含恶化工作的供应链调度问题

A hybrid VNS-HS algorithm for a supply chain scheduling problem with deteriorating jobs

International Journal of Production Research · 2017
被引 39
ABS 3

中文导读

研究了两阶段供应链中考虑并行批处理机、恶化工作和运输协调的调度问题,提出混合VNS-HS算法以高效求解,实验验证了算法有效性。

Abstract

This paper investigates a coordinated scheduling problem in a two stage supply chain where parallel-batching machine, deteriorating jobs and transportation coordination are considered simultaneously. During the production stage, jobs are processed by suppliers and there exists one parallel-batching machine in each supplier. The actual processing time of a job depends on its starting time and normal processing time. The normal processing time of a batch is equal to the largest normal processing time among all jobs in its batch. During the transportation stage, the jobs are then delivered to the manufacturer. Since suppliers are distributed in different locations, the transportation time between each supplier and the manufacturer is different. Based on some structural properties of the studied problem, an optimal algorithm for minimising makespan on a single supplier is presented. This supply chain scheduling problem is proved to be NP-hard, and a hybrid VNS-HS algorithm combining variable neighbourhood search (VNS) with harmony search (HS) is proposed to find a good solution in reasonable time. Finally, some computational experiments are conducted and the results demonstrate the effectiveness and efficiency of the proposed VNS-HS.

供应链调度元启发式算法生产调度恶化工作