公共招标书的时间安排:模型与启示

Scheduling Public Requests for Proposals: Models and Insights

Production and Operations Management · 2018
被引 8
FT 50UTD 24ABS 4

中文导读

研究了公共采购招标时间安排如何影响投标数量及采购成本,提出了优化框架和启发式方法,应用于佛罗里达州交通部的实际案例,发现优化时间安排可显著降低成本。

Abstract

We show that the schedule for contracting public procurements can impact the number of proposals and thereby the cost of procured services or products. This holds when the market for procurement contracts is not perfectly competitive, which is typically the case for large and costly public procurements. We formalize this previously unexplored operational level problem of scheduling procurement contracting and develop an optimization framework to solve it. For large problems we propose a hierarchical optimization heuristic. Furthermore, we develop heuristics that do not require solving optimization problems, such as (i) equal number with mixed cost scheduling heuristic and (ii) equal cost scheduling heuristic. We show that depending on the characteristics of the procurement contract scheduling problem either of these approaches provides nearly the same expected total procurement cost as the optimal schedule. We apply our optimization framework to the Florida Department of Transportation's procurement contracts scheduling problems. We show that the optimized schedules are expected to yield significant cost savings over the actual schedules employed in practice. Our results have implications for public policy suggesting that the fiscal stimulus funds are cost‐effective to allocate for many small projects instead of few large projects.

采购运营管理运筹学公共政策