基于专家观点的维纳随机过程与贝叶斯结构的项目完工时间估计

Estimation of project completion time using wiener random process and Bayesian structure based on expert’s point of view

Journal of the Operational Research Society · 2018
被引 1
ABS 3

中文导读

研究了利用维纳随机过程和贝叶斯结构,结合专家观点与新观测数据来更新分布,以提高项目完工时间估计的准确性,并通过实际案例验证了方法的有效性。

Abstract

One of the important issues in project control is the estimation of project completion time. High accuracy in estimation can have a significant effect on project evaluation cost. Therefore, presenting a suitable method for estimation is essential. By definition, a project is a temporary work that is done just once in order to create a specific product or service. Therefore, the structure of a project (especially long term projects) has many uncertainties. Using the Wiener random process, with regard to the updating structure of its distribution based on expert’s point of view and new observation data, is a studied subject in this paper. Finally, by applying the data of a real case study, the benefits of estimation method has been shown and its results have been studied.

项目管理工程管理运筹学统计学