面向成本的多模型资源受限装配线平衡问题的建模与求解

Modelling and solving a cost-oriented resource-constrained multi-model assembly line balancing problem

International Journal of Production Research · 2018
被引 38
ABS 3

中文导读

研究了纺织行业中多产品类型、考虑资源需求的装配线平衡问题,提出一种结合经典方法与分布估计算法的混合求解方法,在文献基准和实际数据上均优于现有技术。

Abstract

A line balancing problem considers the assignment of operations to workstations in an assembly line. While assembly lines are usually associated to mass production of standardised goods, their advantages have led to their widespread use whenever a product-oriented production system is applicable and the benefits of the labour division and specialisation are significant, even when some of its characteristics may deviate from classical assembly lines. In this work, we study a line balancing problem found in the textile industry in which the line must be balanced for multiple types of goods taking into account resource requirements. In order to solve the problem, a hybrid method that combines classical methods for line balancing with an Estimation of Distribution Algorithm is proposed. Computational experiments show that the new procedure improves upon the state of the art when compared using a benchmark set derived from the literature, as well as when compared using data from the manufacturer that originated this research work.

装配线平衡纺织工业资源受限多模型生产混合算法