技术密集型项目环境中不确定任务的管理:任务关闭与容量管理决策的多方法研究

Managing uncertain tasks in technology‐intensive project environments: A multi‐method study of task closure and capacity management decisions

JOURNAL OF OPERATIONS MANAGEMENT · 2019
被引 25
人大 AFT50UTD24ABS 4*

中文导读

研究了技术密集型项目中任务解决的不确定性,通过实证和建模分析任务关闭政策如何优化工程师的精力分配,提高系统生产率,对项目管理者有实际指导意义。

Abstract

Abstract Engineers working on tasks in technology‐intensive project environments face substantial task resolution uncertainty. This can result in poor capacity utilization as they expend effort on tasks that are not successfully resolved. A deeper understanding of task‐related uncertainty can help the firm optimize effort allocation across tasks by implementing well‐designed task closure policies that facilitate superior capacity utilization and capacity planning. In this article, we characterize the empirical distribution of task uncertainty and demonstrate how the resolution process affects task outcomes in project environments. Using a combination of empirical estimation, and analytical and simulation modeling, we develop insights into task‐related decision‐making and engineer effort allocation. Using real‐world task resolution data from a software maintenance setting, we first model and estimate a beta‐geometric survival distribution which indicates that the likelihood of successful task resolution substantially reduces with the time a task remains in the system. Using analytical and simulation modeling, we then examine the implications of imposing task closure policies to improve engineer effort allocation and increase system productivity. We demonstrate that adopting well‐designed task closure policies can significantly improve engineer resource utilization in capacity‐constrained settings without a substantial negative impact on project outcomes. We discuss the implications of our research for theory and practice.

项目管理任务不确定性资源分配软件维护运营管理