可变节拍时间组与工作量均衡

Variable takt time groups and workload equilibrium

International Journal of Production Research · 2020
被引 23
ABS 3

中文导读

针对固定节拍装配线在定制化生产中的过载问题,提出可变节拍时间组(VTG)概念,通过工作量均衡模型和启发式算法VTGA,在两家德国制造商的真实数据中验证了其相比固定节拍能提高劳动效率。

Abstract

Natural disasters, pandemics, and political nationalism force companies toward more responsive, flexible, and resilient assembly systems. For manufacturers, adaptability of the assembly process and local production ensure short product lead times even during supply chain disruptions. Yet one downside of regional production is that fixed takt time assembly lines become overburdened, especially when customisation is unlimited. In this context, variable takt time groups (VTGs) are a major competitive lever. We introduce the notion of a workload equilibrium balancing overload and underutilization. This preliminary stage of the assembly line balancing and sequencing problem significantly reduces the planning effort. Moreover, we present a model for minimising (i) the number of VTGs for a given maximum operator drift per unit or (ii) the maximum operator drift per unit for a given number of VTGs. We solve these dynamic problems by developing a heuristic approach: the variable takt time groups algorithm (VTGA). In our analysis of three real-world data sets from two German manufacturers—Fendt and Rolls-Royce Power Systems—we benchmark the VTGA against existing takt times. We find that VTGs result in higher labour efficiency than a fixed takt time and that the VTGs segmentation level plays an important role in reducing operator inefficiencies.

运营管理供应链管理工业工程生产调度