基于时间段的混合两阶段流水车间调度与辅助资源问题

Hybrid two stage flowshop scheduling with secondary resources based on time buckets

International Journal of Production Research · 2021
被引 13
ABS 3

中文导读

研究了带辅助资源(工人)的两阶段混合流水车间调度问题,目标是最小化平均延迟时间,提出了启发式算法来生成作业序列和工人分配方案。

Abstract

This work studies a two-stage hybrid flowshop problem with secondary resources (workers). The goal is to minimise the average tardiness. The workers are assigned to the workstations by time buckets (work shifts), and the assignment changes during the planning horizon. Two versions of the problem are studied: (i) the case where the average efficiency of the workers determines the time to process jobs; (ii) the case where the efficiency of the slowest worker assigned to a workstation determines the time to process jobs. The problem is NP hard and a set of heuristics are proposed to generate job sequences and worker assignments. Computational experiments are performed on randomly generated test problems. The experiments revealed that the proposed heuristics are able to find a large percentage of the optimal solutions for small sized instances, while on large sized instances the heuristic performance depended on experimental factors.

生产调度流水车间启发式算法工人分配