混凝土行业中一维多期下料问题研究

One-dimensional multi-period cutting stock problems in the concrete industry

International Journal of Production Research · 2021
被引 15
ABS 3

中文导读

研究了空心楼板生产中的模具使用优化问题,提出两个数学模型和启发式解法,基于企业实际数据验证了紧凑模型启发式更优。

Abstract

This research looks at the production planning of hollow-core slabs integrated to the optimisation problem of the use of moulds. Considering the production process of these structures, two mathematical models are proposed for the arising problem, which consists of a one-dimensional multi-period cutting stock problem with innovative aspects regarding the multiple manufacturing modes that can be used to produce the slabs. In addition, a theoretical analysis of the proposed models is presented. These models are solved using heuristic methods, both aiming to minimise production and inventory costs. Using data based on real information provided by a company, the computational results showed that the heuristic based on the compact model performed better than the one based on the extended model, due to some characteristics specific to the problem being studied.

生产计划运筹学工业工程优化问题混凝土行业