🌙

生产流水线中的缓冲区分配问题:一种基于Benders分解的精确求解新方法

Buffer allocation problem in production flow lines: A new Benders-decomposition-based exact solution approach

IISE Transactions · 2021
被引 11
ABS 3

中文导读

针对长生产流水线缓冲区分配问题,提出一种混合整数线性规划模型和Benders分解算法,利用可逆性和单调性生成多个Benders割,显著提升计算效率,为实际生产提供精确求解方法。

Abstract

The Buffer Allocation Problem (BAP) in production flow lines is very relevant from a practical point of view and very challenging from a scientific perspective. For this reason, it has drawn great attention both in industry and in the academic community. However, despite the problem’s relevance, no exact method is available in the literature to solve it when long production lines are being considered, i.e., in practical settings. This work proposes a new Mixed-Integer Linear Programming (MILP) formulation for exact solution of sample-based BAP. Due to the huge number of variables and constraints in the model, an algorithm based on Benders decomposition is proposed to increase the computational efficiency. The algorithm iterates between a simulation module that generates the Benders cuts and an optimization module that involves the solution of an updated MILP model. Multiple Benders cuts after each simulation run are generated by exploiting the structural properties of reversibility and monotonicity of flow line throughput. The new MILP formulation is tighter than the state-of-the-art model from a theoretical point of view, and order of magnitude of computation time saving is also observed in the numerical results.

生产系统运筹优化整数规划仿真优化