多资源约束作业车间的订单投放、调度与资源分配:基于仿真的评估

Order release, dispatching and resource assignment in multiple resource-constrained job shops: an assessment by simulation

International Journal of Production Research · 2021
被引 16
ABS 3

中文导读

通过仿真评估了订单投放、调度和资源分配规则对多资源约束按订单生产车间的影响,发现有效控制能改善时间与延迟绩效,但优先处理缺资源最少的订单反而会降低性能。

Abstract

In manufacturing shops in practice, machine capacity is often constrained by more than one type of resource. Yet research mainly focusses on the effects of only one type of resource that constrains machine capacity, e.g. labour, tooling or auxiliary constraints. In response, we use simulation to assess the impact of order release, dispatching and resource assignment rules in make-to-order job shops with multiple resource constraints. The capacity wasted while a machine stands idle waiting for other resources increases with the number of constraints, and all three production planning and control functions have little impact on this waiting time. Effective production planning and control can however improve operational performance in terms of time and tardiness-related measures. In general, combining order release control with a dispatching rule that prioritises jobs for which all resources are available at dispatching and a longest queue resource assignment rule leads to the best performance. Most importantly, and rather counterintuitively, prioritising orders with the fewest missing resources worsens the performance of both the dispatching and resource assignment rule since it reduces resource utilisation during periods of high load. Results from dual resource-constrained shops are consequently not directly transferable to more complex resource-constrained shops.

生产计划与控制作业车间调度运营管理仿真