考虑危险任务失败的拆解线平衡问题的随机规划方法

A stochastic programming approach for the disassembly line balancing with hazardous task failures

International Journal of Production Research · 2021
被引 20
ABS 3

中文导读

研究了部分拆解线平衡问题,其中危险任务的成功完成不确定,失败会损坏当前及后续工作站的任务,通过两阶段随机混合整数规划最大化预期净收入,数值实验表明模型能快速求解多达73个任务的实例。

Abstract

We consider a partial disassembly line balancing problem with hazardous tasks whose successful completions are uncertain. When any hazardous task fails, it causes damages of the tasks on the workstation that it is performed on and all remaining tasks to be performed in the succeeding workstations. We attribute probabilities for the successful completion and failure of the hazardous tasks and aim to maximise the total expected net revenue. We formulate the problem as a two-stage stochastic mixed-integer programme where the assignment of the tasks to the workstations is decided in the first-stage, before the resolution of the uncertainty. We give the formulation for one, two and three hazardous tasks, and then extend to the arbitrary number of hazardous tasks. Our numerical results reveal that proposed stochastic programming models return satisfactory performance and can solve instances with up to 73 tasks very quickly. We observe that the number of tasks, number of hazardous tasks and success probabilities are the most significant parameters that affect the performance. We quantify the value of capturing uncertainty using the expected objective values attained by the solution of the stochastic model and that of the expected value model, and obtain very satisfactory results.

拆解线平衡危险废物随机规划整数规划运营管理