🌙

结合ILS优化算法与仿真过程解决移动式岸桥工人分配与平衡问题

Coupling the ILS optimisation algorithm and a simulation process to solve the travelling quay-crane worker assignment and balancing problem

Journal of the Operational Research Society · 2021
被引 12
ABS 3

中文导读

针对集装箱码头岸桥操作员分配问题,提出数学模型和迭代局部搜索算法,结合仿真优化机制评估方案鲁棒性,实现工作负载平衡并提高效率。

Abstract

In container terminals (CTs), the performance of quay cranes (QCs) is extremely impacted by their operators’ productivity, which makes the QC worker assignment a relevant element in the QC scheduling. Nevertheless, in the literature, this problem was tackled without considering the objectives of balancing operators’ workload and minimising the distance required to move between QCs, even though practitioners underline their importance in maintaining an efficient working environment. Accordingly, and based on a real-case study raised by a CT partner, this paper addresses a novel problem referred to as the travelling QC worker assignment and balancing problem. First, we propose a novel mathematical model with original constraints faced by the company to assign operators to QCs on a daily basis. Second, to find approximate solutions in a reasonable time, a constructive heuristic and an iterative local search (ILS) are proposed and tested on real datasets. We also propose a simulation-optimisation mechanism to evaluate the robustness of the solutions under real-time probabilistic perturbations. The proposed algorithms are integrated into a decision support tool, a network-linked application allowing users in a real CT to generate automatic assignments. The proposed simulation-optimisation procedure helps obtain balanced planning, avoid workload conflicts, and increase productivity.

集装箱码头岸桥调度工人分配工作负载平衡优化算法