分时电价下两台机器伯努利串行生产线的能源成本优化

Energy cost optimisation in two-machine Bernoulli serial lines under time-of-use pricing

International Journal of Production Research · 2021
被引 10
ABS 3

中文导读

研究了两台机器伯努利串行生产线在分时电价下的能源成本优化问题,通过将问题转化为不同电价时段的生产率最优分配,提出了一种高效求解方法。

Abstract

Energy cost optimisation in manufacturing systems has gained more and more attention. Although there are many papers about energy consumption optimisation in serial production lines, energy cost optimisation in serial production lines has rarely been focused. In this paper, we formulate an energy cost optimisation problem in two-machine Bernoulli serial line under time-of-use pricing. We analyse the structural characteristics of the problem and transform the problem into optimally allocating the production rate among the time periods of different electricity rates. A definition of the extreme allocation is proposed and completed, and the optimal allocation is proved to be one of the extreme allocations. Using the property, an efficient method to solve the optimal allocation is proposed. With the help of the method, the multi-electricity-rate problem is transformed into several single-electricity-rate problems, which has been solved in the literature.

生产系统优化能源成本分时电价伯努利生产线