探索仿真建模与施工生产计划和控制之间的联系:基于最后计划者系统的案例研究

Exploring the links between simulation modelling and construction production planning and control: a case study on the last planner system

Production Planning and Control · 2021
被引 22
ABS 3

中文导读

研究提出一个框架,将仿真建模与最后计划者系统(LPS)结合,利用LPS输出构建有效仿真模型,并通过案例验证其可行性,旨在减少仿真数据需求和建模工作量,促进仿真在施工行业的应用。

Abstract

Simulation modelling has been utilised as a decision-support tool for different production systems. However, simulation uptake in construction is lagging due to several challenges such as the extensive data requirements and modelling efforts in a simulation study. This paper aims at addressing this gap by introducing a framework that integrates the practices of simulation modelling with the Last Planner® System (LPS), which is a well-established production planning and control method. The framework focuses on exploiting the outputs of implementing the LPS to support building a valid simulation model. A case study is conducted to test the applicability of the proposed framework. Based on the findings of the study, it can be concluded that the LPS provides a promising avenue for integration with simulation modelling due to the shared processes and requirements between both methods, which may lead to minimised data requirements and modelling efforts for simulation, thus improving simulation uptake in the construction industry.

施工管理生产计划与控制仿真建模最后计划者系统