具有任意优先关系图的柔性作业车间调度问题

Flexible Job Shop Scheduling Problems with Arbitrary Precedence Graphs

Production and Operations Management · 2021
被引 27
人大 AFT50UTD24ABS 4

中文导读

研究了作业工序间存在任意优先关系的柔性车间调度问题,提出了混合整数规划、约束规划模型和进化算法,在基准测试中创造了59个新最优解和61个新下界。

Abstract

A common assumption in the shop scheduling literature is that the processing order of the operations of each job is sequential; however, in practice, there can be multiple connections and finish‐to‐start dependencies among the operations of each job. This paper studies flexible job shop scheduling problems with arbitrary precedence graphs. Rigorous mixed integer and constraint programming models are presented, as well as an evolutionary algorithm is proposed to solve large‐scale problems. The proposed heuristic solution framework is equipped with efficient evolution and local search mechanisms as well as new feasibility detection and makespan estimation methods. To that end, new theorems are derived that extend previous theoretical contributions of the literature. Computational experiments on existing benchmark datasets show that the proposed solution methods outperform the current state‐of‐the‐art. Overall, 59 new best solutions and 61 new lower bounds are produced for a total of 228 benchmark problem instances of the literature. To explore the impact of the arbitrary precedence graphs, lower bounds and heuristic solutions are generated for new large‐scale problems. These experiments illustrate that the machine assignment flexibility and density of the precedence graphs, affect not only the makespan, but also the difficulty of producing good upper bounds.

作业车间调度整数规划进化算法约束规划生产调度