共享经济中随机两阶段开放车间调度问题的双目标建模与优化

Bi-Objective Modeling and Optimization for Stochastic Two-Stage Open Shop Scheduling Problems in the Sharing Economy

IEEE Transactions on Engineering Management · 2021
被引 48
ABS 3

中文导读

针对共享经济中车辆维修过程,提出一个随机双目标两阶段开放车间调度问题,最小化总延迟和加工成本,并设计混合多目标迁移鸟优化算法求解。

Abstract

Nowadays, many manufacturing and service industries prefer to share resources such as facilities and workers to cooperatively perform tasks, which can efficiently improve resource utilization and customer satisfaction. Generally, the decision-makers need to pay more for resource usage, leading to an urgent demand to decrease operational costs. This article proposes a stochastic bi-objective two-stage open shop scheduling problem that models a vehicle maintenance process where tasks are appointed to be completed by multiple third-party companies with professional equipment. We formulate this optimization problem by minimizing the total tardiness and processing cost subject to various resource constraints. A hybrid multiobjective migrating birds optimization combined with a genetic operation and a discrete event system is designed by considering problem characteristics to solve the problem. In this method, the migrating birds optimization with some particular strategies aims at searching candidate solutions from the entire solution domain. Simultaneously, the discrete event system, by using stochastic simulation and discrete event-based simulation approaches, focuses on evaluating the performance of searched solutions. Simulation experiments are performed, and state-of-the-art algorithms are used as competitive approaches. The results confirm that this approach has an excellent performance in handling our considered problem.

共享经济调度优化多目标优化仿真