研究了设备不可靠且存在周期超限的生产系统,建立了数学模型,分析了减少停机或超限对改进效率的影响,并讨论了瓶颈识别方法,通过汽车变速箱加工线案例验证。

Abstract

Production systems literature usually attributes throughput losses to two reasons: unreliable equipment and random part processing time (also referred to as machine cycle time). In practice, however, one more reason for throughput losses is observed: cycle overrun. The specificity of cycle overrun is that not all parts may require more time than allotted by a fixed cycle time and, if the overrun does occur, its duration is coupled with the part processing time: typically, it is a fraction or a small multiple of the cycle time. This paper is indented to develop methods for analysis and improvement of production systems with unreliable machines and cycle overrun. Specifically, it introduces a mathematical model of an unreliable machine with cycle overrun, develops its simplified version, explores the efficacy of machines' improvability by reducing either downtime or cycle overrun, and discusses the issue of bottleneck identification. These results are obtained under the exponential assumption on machine reliability and overruns and then extended to the non-exponential case. Finally, the methods developed are illustrated by a case study based on an automotive transmission case machining line.

生产系统可靠性工程瓶颈识别汽车制造业制造工程