机器人加入人工作业装配线时任务分配与节拍时间的数学规划模型分析

An analysis of task assignment and cycle times when robots are added to human-operated assembly lines, using mathematical programming models

International Journal of Production Economics · 2021
被引 55
ABS 3

中文导读

研究了在人工装配线中加入机器人后,如何调整传统装配线平衡模型来确定最优工作站数量和节拍时间,并用电源逆变器装配线数据验证了模型的有效性。

Abstract

Adding robots to a human-operated assembly line influences both the short- and long-term operation of the line. However, the effects of robots on assembly line capacity and on cycle time can only be studied if appropriate task assignment models are available. This paper shows how traditional assembly line balancing models can be changed in order to determine the optimal number of workstations and cycle time when robots with different technological capabilities are able to perform a predetermined set of tasks. The mathematical programming models for the following three cases are presented and analysed: i) only workers are assigned to the workstations; ii) either a worker or a robot is assigned to a workstation; iii) a robot and a worker are also assigned to specific workstations. The data of an assembly line producing power inverters is used to illustrate the proposed calculations. Both the assignment of tasks and the changes of cycle time are analysed within the AIMMS modelling environment. The computational characteristics of the proposed mathematical programming models are also examined and tested using benchmark problems. The models presented in this paper can assist operations management in making decisions relating to assembly line configuration.

装配线平衡任务分配机器人数学规划运营管理