通过模拟生命周期中再次循环最大化利益相关者学习:公共交通案例研究

Maximising stakeholder learning by looping again through the simulation life-cycle: A case study in public transport

Journal of the Operational Research Society · 2021
被引 6
ABS 3

中文导读

研究了如何通过增加模拟生命周期的“第二循环”,让已有模型服务于新利益相关者,从而最大化组织学习收益,并以欧洲之星案例展示方法框架和实际效益。

Abstract

Building a simulation model of a complex system requires significant investment of expertise, time, and expense. In order for an organisation to realise the greatest return on this investment, it is advantageous to re-use a model or extend the simulation model’s life-cycle to maximise learning generated from it. Existing studies typically end after a ‘single loop’ of the simulation life-cycle, with the computer model produced at the end of it suitable for addressing the initial requirements of stakeholders. Here we explore how to further extend the modelling life-cycle by adding a ‘second loop’ in which an existing simulation model is introduced to a new group of stakeholders and then enhanced to capture additional features of the system that are of interest to this new group, but were not identified as requirements by the first group. Developed from real-world experience working with the large train operator Eurostar International Limited, we present details of our proposed methodological framework and highlight the tangible benefits of adding a second loop to the simulation life-cycle. We discuss the roles of modellers and stakeholders in the two loops of the life-cycle and compare and contrast the relationship between the two parties in each.

模拟建模利益相关者学习生命周期管理公共交通运营研究