Bi-objective facility location under uncertainty with an application in last-mile disaster relief
研究了救灾最后一公里网络设计中考虑需求不确定性的双目标设施选址问题,比较了随机规划、鲁棒优化和风险规避方法,并用塞内加尔干旱案例验证了方法有效性。
Abstract Multiple and usually conflicting objectives subject to data uncertainty are main features in many real-world problems. Consequently, in practice, decision-makers need to understand the trade-off between the objectives, considering different levels of uncertainty in order to choose a suitable solution. In this paper, we consider a two-stage bi-objective single source capacitated model as a base formulation for designing a last-mile network in disaster relief where one of the objectives is subject to demand uncertainty. We analyze scenario-based two-stage risk-neutral stochastic programming, adaptive (two-stage) robust optimization, and a two-stage risk-averse stochastic approach using conditional value-at-risk (CVaR). To cope with the bi-objective nature of the problem, we embed these concepts into two criterion space search frameworks, the $$\epsilon $$ <mml:math xmlns:mml="http://www.w3.org/1998/Math/MathML"> <mml:mi>ϵ</mml:mi> </mml:math> -constraint method and the balanced box method, to determine the Pareto frontier. Additionally, a matheuristic technique is developed to obtain high-quality approximations of the Pareto frontier for large-size instances. In an extensive computational experiment, we evaluate and compare the performance of the applied approaches based on real-world data from a Thies drought case, Senegal.