双流连铸环境下钢板制造集成批处理问题

An integrated batching problem for steel plate manufacturing with bi-strand casting

International Journal of Production Research · 2022
被引 7
ABS 3

中文导读

研究了钢板制造中炼钢与连铸过程的集成批处理问题,提出混合整数规划模型和数学启发式算法,在双流铸造环境下优于企业现有方案。

Abstract

We consider an integrated batching problem for steel-making and continuous casting process of steel plate manufacturing. For steel-making, slab batching problem is defined to make charges from slabs, and for continuous casting, charge batching problem is defined to make casts from charges. Our batching problem is regarded as a combination of slab batching and charge batching problems. Since steel-making and continuous casting are processes that must be synchronised, two batching problems must be integratedly handled. However, because of their difficulties, most papers solved each batching problem sequentially. We deal with a batching problem under bi-strand casting environment where slabs are cast with two strands. We also consider practical aspects that were barely considered before such as slab length difference constraints between strands and casts having few charges. We propose two mixed integer programming models. The first one is to create frames to define the overall structure of the solution and the second one is to fill the created frames with slabs to concretise the solution. The proposed matheuristic algorithm solves the problem in an integrated manner and finds a near-optimal solution in a reasonable time. It outperforms the company's current practice, as shown in experiments with real and randomly generated data.

钢铁制造连续铸造数学优化生产调度