单机总加权延迟批量调度的精确方法

Exact Approaches for Single Machine Total Weighted Tardiness Batch Scheduling

INFORMS journal on computing · 2022
被引 11
人大 BUTD24ABS 3

中文导读

针对有释放日期、不同尺寸且兼容的作业的单机总加权延迟批量调度问题,提出了两种整数线性规划模型,并开发了基于列生成的精确算法,能求解多达100个作业的实例。

Abstract

This paper addresses a single machine total weighted tardiness (TWT) batch-scheduling problem in which jobs have release dates, nonidentical sizes, and are compatible between each other. We propose two integer linear programming models: the first one is a time-indexed formulation (TIF), and the second is an innovative time-size-indexed formulation (TSIF). Although TIF clearly outperforms the existing formulation for the problem, TSIF is capable of producing much stronger bounds in practice. The latter also enables us to develop an efficient column-generation (CG) algorithm. The pricing subproblem corresponds to a resource-constrained shortest path problem that is solved using a bucket graph–based labeling algorithm. The solutions of such a subproblem may contain cycles (reprocessing of jobs), and thus, a memory mechanism called dynamic arc-based ng-sets is employed in the labeling with a view toward avoiding some of them. Moreover, we also implement a preprocessing scheme based on Lagrangian relaxation to perform variable fixing. Extensive computational experiments were carried out in 810 benchmark instances. The proposed CG algorithm is capable of solving instances with up to 100 jobs to optimality. In addition, we believe that this is the first exact approach for a TWT batch-scheduling variant capable of systematically solving instances with up to 50 jobs. High-quality results are also reported for three special cases of the problem—more precisely, when (i) the penalty weights are unitary, (ii) there are no release dates, and (iii) all due dates are set to zero and, hence, the objective becomes equivalent to minimizing the weighted completion time. Summary of Contribution: This paper provides the first exact algorithm for a standard variant of a batch-scheduling total weighted tardiness problem that can solve instances with up to 100 jobs to optimality, a considerable leap with respect to previous works. In particular, we propose a time-indexed formulation that has the advantage of being relatively simple to implement, and yet we show that it is not theoretically dominated by the other innovative formulation proposed in the paper referred to as the time-size-indexed formulation (TSIF). Moreover, we present a Lagrangian approach to quickly fix variables and an iterative column-generation (CG) procedure over a Dantzig–Wolfe decomposition of TSIF that combines an efficient pricing algorithm with a dynamic scheme to adjust the subproblem constraints. The proposed CG approach is capable of producing very strong bounds for the problem as well as for some of its special cases.

调度整数规划列生成运筹学生产管理