受限区域内的工人调度

Scheduling workers in a constricted area

Naval Research Logistics · 1996
被引 0
ABS 3

中文导读

针对飞机维修中空间受限的调度问题,提出二维划分问题的推广模型,并给出当最大同时工作人数为2或3时的优化算法,以最小化完工时间。

Abstract

A generalization of the equi-partitioning problem, termed the 2D-Partition Problem, is formulated. The motivation is an aircraft maintenance scheduling problem with the following characteristics. The complete maintenance overhaul of a single aircraft requires the completion of some 350 tasks. These tasks require a varying number of technicians working at the same time. For large subsets of these 350 tasks, the constraining resource is physical space—tasks must be completed in a physical space of limited size such as the cockpit. Furthermore, there is no precedence relationship among the tasks. For each subset, the problem is to schedule the tasks to minimize makespan. Let m denote the maximum number of technicians that can work at the same time in the physical area under consideration. We present optimization algorithms for m = 2 and 3. © 1996 John Wiley & Sons, Inc.

计算机科学运筹学运营管理调度问题航空维护