Solving Biobjective Distributed Flow-Shop Scheduling Problems With Lot-Streaming Using an Improved Jaya Algorithm
针对分布式工厂中带批量流的流水车间调度问题,同时优化完工时间和总能耗,提出改进Jaya算法,通过NEH初始化、工厂分配策略和能效改进策略,在120个实例上验证了算法的竞争力。
A distributed flow-shop scheduling problem with lot-streaming that considers completion time and total energy consumption is addressed. It requires to optimally assign jobs to multiple distributed factories and, at the same time, sequence them. A biobjective mathematic model is first developed to describe the considered problem. Then, an improved Jaya algorithm is proposed to solve it. The Nawaz-Enscore-Ham (NEH) initializing rule, a job-factory assignment strategy, the improved strategies for makespan and energy efficiency are designed based on the problem's characteristic to improve the Jaya's performance. Finally, experiments are carried out on 120 instances of 12 scales. The performance of the improved strategies is verified. Comparisons and discussions show that the Jaya algorithm improved by the designed strategies is highly competitive for solving the considered problem with makespan and total energy consumption criteria.