POSSIBILITIES OF CLIENTS AND CONTRACTOR'S DISPUTES SETTLEMENT AT THE PRETRIAL STAGE
用经济学方法分析施工过程中双方在审前阶段解决争议的行为,通过乐观偏差和信息不对称模型找出对双方最有利的策略,并评估诉讼的社会价值。
The article analyses, by using economic methods, the probable behaviour of construction process parties during a dispute settlement. With the use of optimism (or differing perceptions) and asymmetric information models an attempt is made to determine the most economically advantageous behavioural pattern for both parties at the pretrial stage and analyses social value of a litigation dispute.