坎福德水电站:投资评估案例研究

Hydropower at Canford: A Case Study in Investment Appraisal

Journal of the Operational Research Society · 1988
被引 0
ABS 3

中文导读

本文通过案例研究,使用净现值法和敏感性分析评估在多塞特坎福德学校安装小型径流式水电站的经济可行性,对项目评估和能源投资决策有参考价值。

Abstract

This paper reports a case-study investigation into the economic desirability of generating hydroelectric power from the River Stour for Canford School, Dorset, as part of a larger feasibility study, which won a 1985 Molins Design Prize. A parametric discounting approach to net present-value assessment was used to examine the economic benefits of installing a small run-of-river hydropower scheme. Sensitivity analysis was used to clarify the effects of uncertainties in the limited cost and rate data available at the feasibility stage of the project. The role of the economic analysis in relation to other aspects of the feasibility study is indicated.

投资评估水电净现值成本效益分析案例研究