Local search methods for the discrete time/resource trade‐off problem in project networks
研究了项目网络中离散时间与资源的权衡问题,提出一种基于分解的禁忌搜索算法,通过模式分配和资源约束调度两阶段求解,并与其他局部搜索方法比较了计算效果。
In this paper we consider the discrete time/resource trade-off problem in project networks. Given a project network consisting of nodes (activities) and arcs (technological precedence relations), in which the duration of the activities is a discrete, nonincreasing function of the amount of a single renewable resource committed to it, the discrete time/resource trade-off problem minimizes the project makespan subject to precedence constraints and a single renewable resource constraint. For each activity, a work content is specified such that all execution modes (duration/resource requirement pairs) for performing the activity are allowed as long as the product of the duration and the resource requirement is at least as large as the specified work content. We present a tabu search procedure which is based on a decomposition of the problem into a mode assignment phase and a resource-constrained project scheduling phase with fixed mode assignments. Extensive computational experience, including a comparison with other local search methods, is reported. © 1998 John Wiley & Sons, Inc. Naval Research Logistics 45: 553–578, 1998