并行非相关机器带设置时间的工作负载分配问题的混合边界方法

A Hybrid Bounding Procedure for the Workload Allocation Problem on Parallel Unrelated Machines with Setups

Journal of the Operational Research Society · 1996
被引 1
ABS 3

中文导读

针对并行非相关机器且带设置时间的单阶段制造过程,提出一种混合近似方法,依次求解拉格朗日松弛对偶和拉格朗日分解对偶,为最优完工时间提供下界,并报告了计算结果。

Abstract

A nonpreemptive single stage manufacturing process with parallel, unrelated machines and multiple job types with setups (PUMS) is considered. We propose a hybrid approximation procedure where a Lagrangean relaxation dual and a Lagrangean decomposition dual are solved one after the other to generate a good lower bound on the optimal makespan value. Computational results are reported.

生产调度运筹优化并行机器调度拉格朗日松弛