中文导读

研究了电力公司通过直接负荷控制合同削减高峰用电的优化问题,提出一种近似方法,在加州三大电力公司数据上使发电成本节省提高37.7%。

Abstract

We study direct load control contracts that utilities use to curtail customers’ electricity consumption during peak-load periods. These contracts place limits on the number of calls and total number of hours of power reduction per customer per year as well as the duration of each call. The stochastic dynamic program that determines how many customers to call and the timing and duration of each call for each day is an extremely difficult (NP-hard) optimization problem. We design a scenario-based approximation method to generate probabilistic allocation polices in a reasonable amount of time. Our approach consists of three approximations: deterministic approximation of demand, discretization of the expected demand, and aggregation/disaggregation of the resources. We show the relative information error resulting from the deterministic approximation is [Formula: see text], the discretization error is [Formula: see text], and the aggregation/disaggregation error is [Formula: see text], where n represents the length of the horizon. Finally, we show the total relative error is [Formula: see text]. Our error analysis establishes that our approximation method is near optimal. In addition, our extensive numerical experiments verify the high quality of our approximation approach. The error, conservatively measured, is quite small and has an average and standard deviation of 8.6% and 1.4%, respectively. We apply our solution approach to the data provided by three major utility companies in California. Overall, our study shows our procedure improves the savings in energy-generation cost by 37.7% relative to current practices. This paper was accepted by Chung Piaw Teo, optimization. Funding: The authors thank the UCLA Ziman Center’s Howard and Irene Levine Program in Housing and Social Responsibility and the Morrison Family Center for Marketing Studies and Data Analytics for generous funding. Supplemental Material: The online appendices are available at https://doi.org/10.1287/mnsc.2022.4493 .

直接负荷控制峰荷管理随机动态规划近似方法误差分析