基于凸重构的精确二次规划方法求解单元生产调度问题

An exact quadratic programming approach based on convex reformulation for seru scheduling problems

Naval Research Logistics · 2022
被引 21
ABS 3

中文导读

针对工厂实际生产调度问题,研究单元生产系统中的调度,以最小化提前和延迟惩罚为目标,建立0-1二次规划模型并用凸重构方法求解,实验表明该方法能高效获得近似最优解。

Abstract

Abstract Motivated by a practical production scheduling problem at a factory, this article studies scheduling problems in seru production system (SPS). Seru is a relatively new‐type production mode originating in Japan and has brought inspiring benefits to production practice. Following the just‐in‐time philosophy of SPS, the objective of seru scheduling problem is to minimize the sum of earliness and tardiness penalties. Two common due date types of job are considered, and the seru scheduling problem is formulated as a 0–1 quadratic programming model with linear constraints that is then reformulated using convex reformulation methods to ensure convexity. Computational experiments are implemented. Experimental results indicate that the proposed exact solution method can obtain approximate optimal solutions efficiently and effectively for seru scheduling problems.

生产调度凸优化二次规划准时制生产