人力资源动态分配:金属4.0制造业案例研究

Dynamic allocation of human resources: case study in the metal 4.0 manufacturing industry

International Journal of Production Research · 2022
被引 12
ABS 3

中文导读

针对金属加工车间中操作员静态分配导致瓶颈的问题,提出动态任务分配优化模型,将平均生产延迟降低76%。

Abstract

Industry 4.0 concepts make it possible to rethink human resources allocation, even for more traditional environments like metal machining. While parts machining on Computer Numerical Control (CNC) machines is automated, some manual tasks must still be executed by operators. The current approach is typically that operators are statically allocated to one or many machines. This causes avoidable bottlenecks. We propose an optimisation model to dynamically assign tasks to the operators with the objective of minimising production delays. Three different scenarios are compared; one representing the current widely used static allocation method and two others that allow more flexibility in the operators’ allocation. The dynamic task assignment problem is solved using a constraint programming model. The model was applied to a case study from a high-precision metal manufacturing job shop. Experimental results show that switching from a static allocation to a dynamic one reduces by 76% the average production delays caused by human operators. Supposing more versatile operators under the dynamic allocation leads to further improvements.

工业工程制造业人力资源管理优化算法工业4.0