基于MIP的多地点资源受限项目调度求解方法

MIP-based solution approaches for multi-site resource-constrained project scheduling

Annals of Operations Research · 2022
被引 13
ABS 3

中文导读

针对多地点资源受限项目调度问题,提出连续时间模型和数学启发式算法,在测试实例中平均求解质量和速度优于现有方法。

Abstract

Abstract The execution of a project is often distributed among multiple sites. The planning of such a project includes selecting a specific site for the execution of each of the project’s activities and allocating the available resource units to the execution of these activities over time. While some resource units are available at a certain site only, others can be moved across sites. Given the spatial distance between sites, transportation times arise if a resource unit must be transported from one site to another or if the output of an activity must be transported to another site. This planning problem has been introduced in recent literature as the multi-site resource-constrained project scheduling problem. We present a continuous-time model and devise a matheuristic for this planning problem. The continuous-time model uses, among others, binary variables to impose a sequence between activities assigned to the same resource units. In the matheuristic, the binary restrictions on these variables are initially relaxed and iteratively restored for the subset of activities scheduled in the current iteration. We compare the performance of the continuous-time model and the matheuristic to the performance of a discrete-time model and several metaheuristics from the literature using two sets of test instances from the literature. Both the continuous-time model and the matheuristic derive on average superior solutions in shorter average running times than the reference approaches.

项目管理运筹学数学优化调度问题