Scheduling with present bias
研究了现时偏好对项目调度决策的影响,为短视和自知的决策者设计了优化收入减去成本的算法,并比较了时间一致、短视和自知决策者的表现。
The study of time‐inconsistent decision‐making, in particular present bias, has greatly influenced the field of behavioral economics over the last two decades. Moreover, it has resulted in the design and implementation of widely used incentive schemes for various important applications. However, the effect of present bias on decision‐making for operational problems has been studied less. This work considers the effect of present bias in a simple scheduling system that requires decisions about project timing and sequencing. We design algorithms that enable optimization of revenue less cost under present bias for both naive and sophisticated (i.e., self‐aware) decision‐makers. We describe managerial insights about the relative performance of time‐consistent, naive, and sophisticated decision‐makers, and how to mitigate the effects of present bias. Both theoretical and computational results support these insights.