铁路信号中虚拟编组部署的路线图开发

Roadmap development for the deployment of virtual coupling in railway signalling

Technological Forecasting and Social Change · 2023
被引 28
ABS 3

中文导读

提出一种基于SWOT和混合德尔菲-层次分析法的方法,开发虚拟编组部署的情景路线图,帮助铁路利益相关者识别风险并制定投资计划。

Abstract

Developments in the railway industry are continuously evolving and long-term transition strategies can enable an efficient implementation of signalling technologies that provide a significant increase in network capacity and operation efficiency. Virtual Coupling (VC) advances moving block signalling by further reducing train separation to less than an absolute braking distance using train-to-train communication and cooperative train control within a Virtually-Coupled Train Set (VCTS). This paper proposes a method to develop scenario-based roadmaps based on a SWOT and hybrid Delphi-AHP multi-criteria analysis. Step-changes are identified and initially assessed in a Swimlane based on priorities and time order collected from stakeholders through a survey and further developed in a workshop. Optimistic and pessimistic scenarios are assessed regarding various factors and timelines. Step-changes are initially defined in a Swimlane and then enriched with optimistic and pessimistic scenarios to ultimately derive scenario-based roadmaps. Durations for each of the step-changes are developed into scenario-based roadmaps that can be used as an efficient tool for stakeholders to identify and solve potential criticalities/risks to the deployment of VC as well as to setup investment and development plans. The approach is applied to deliver implementation roadmaps of VC for different market segments with particular focus on mainline railways.

铁路信号虚拟编组路线图规划多准则分析交通工程