固定生产序列中的交货期报价与重调度

Due date quoting and rescheduling in a fixed production sequence

International Journal of Production Research · 2023
被引 4
ABS 3

中文导读

研究了固定生产序列中涉及订单插入和重调度的交货期设置问题,提出一个可解析求解的微分方程模型,能快速给出最早交货期和最新插入位置,结果与高计算量的概率分布方法非常接近。

Abstract

In this article, the due date setting problem consisting of due date quoting, order insertion and rescheduling with relevant sequence-dependent setups and a frozen zone is considered. A differential equation model is introduced. The differential equation can be solved analytically and requires low computing effort. Explicit expressions are gained concerning the earliest possible due date (due date quoting problem) and the latest possible insertion position (rescheduling problem) in order to meet the customer requested due date. The differential equation model is compared with an approach based on a recently introduced hybrid binomial inverse hypergeometric probability distribution for the due date quoting problem. The analytical results of the proposed model are very close to the expectation values (these cannot be explicitly calculated, and high computation effort is required) of the recently introduced approach.

生产调度交货期设置运筹学制造系统