🌙

有限信息下的产能规划

Capacity planning with limited information

Production and Operations Management · 2023
被引 5
人大 AFT50UTD24ABS 4

中文导读

研究了企业在资源需求信息有限时使用的五种产能规划启发式方法,发现实践中常用的“驱动资源”法稳健高效,且使用多个驱动资源能显著提升效果。

Abstract

Limited information about the demand for some of the resources needed to produce goods and services (e.g., incomplete and imperfect bills of materials) forces firms to use heuristics when planning resource capacity. We examine the performance of five heuristics: two drawn from practice, two that modify observed approaches, and one motivated by theory. We measure performance as the ratio of the expected cost of supply–demand mismatch from using a heuristic to the value in the full‐information solution. Numerical analysis shows that a simple heuristic that is common in practice—plan rigorously for a few “driver” resources with high‐quality information and use ratios (e.g., 0.25 indirect labor hours per machine hour) to project the capacities for the remaining “non‐driver” resources—is robust and efficient. Using more than one driver resource to plan for the same non‐driver resource delivers significant gains. Reducing measurement error with respect to the consumption of driver resources dominates the gain from reducing errors in other aspects. Indeed, with high measurement error, collecting information that reduces other sources of error could decrease overall performance. Finally, a greedy algorithm of choosing the most expensive resources as drivers is optimal.

运营管理运筹学启发式算法产能规划