考虑失效依赖的k-out-of-n/C(k′,n′;F)系统检测策略优化:案例研究
Inspection policy optimization for a k-out-of-n/C(k′,n′;F) system considering failure dependence: a case study
Reliability Engineering and System Safety · 2023
被引 12
ABS 3
- Fei Zhao
- Rui Peng
- Nan Zhang 通讯
可靠性工程系统优化工业工程运筹学