🌙

面向下界周期时间的单臂多簇工具双类型晶圆调度

Scheduling Single-Arm Multicluster Tools for Two-Type Wafers With Lower-Bound Cycle Time

IEEE Transactions on Systems, Man, and Cybernetics: Systems · 2023
被引 21
ABS 3

中文导读

针对单臂多簇工具同时加工两种晶圆的问题,提出基于向后策略的调度方法,推导出必要条件并设计算法,实现下界周期时间调度,提升生产率。

Abstract

In today’s semiconductor manufacturing industry, wafer foundries often face the challenge of producing a variety of integrated circuit chip products using a single manufacturing line. To address this, multicluster tools have become a popular choice for processing multiple wafer types simultaneously. Operating such tools involves coordinating the robots in adjacent individual tools to transport multitype wafers through a shared buffer. This study aims to develop a scheduling method for the concurrent fabrication processes of two wafer types, performed by a multicluster tool with wafer residency time constraints. The proposed approach presents a two-backward sequence, based on a backward strategy of a single wafer type, to convert a one-wafer cyclic schedule into a one-wafer-per-type cyclic schedule while revealing its temporal properties. To ensure a smooth operation of a single-arm multicluster tool system and synchronize multiple robots, several necessary and sufficient conditions are derived for the first time. Two efficient algorithms are then proposed to determine the feasibility of a periodic schedule and obtain a schedule that achieves the lower-bound cycle time under a two-backward strategy, maximizing the productivity of such a multicluster tool. Finally, numerical simulations and two practical examples are presented to demonstrate the applications and performance of the proposed approach.

半导体制造调度优化晶圆加工机器人协调