带库存边界的多层级批量问题

Multilevel Lot-Sizing with Inventory Bounds

INFORMS journal on computing · 2023
被引 6
人大 BUTD24ABS 3

中文导读

研究一个单产品多层级批量问题,其中某一层级有库存容量限制(瓶颈层),提出一种结合Zangwill方法和基路径方法的新型动态规划算法,计算测试表明该算法比商业求解器Cplex快得多。

Abstract

We consider a single-item multilevel lot-sizing problem with a serial structure where one of the levels has an inventory capacity (the bottleneck level). We propose a novel dynamic programming algorithm combining Zangwill’s approach for the uncapacitated problem and the basis-path approach for the production capacitated problem. Under reasonable assumptions on the cost parameters the time complexity of the algorithm is [Formula: see text] with L the number of levels in the supply chain and T the length of the planning horizon. Computational tests show that our algorithm is significantly faster than the commercial solver Cplex applied to a standard formulation and can solve reasonably sized instances up to 48 periods and 12 levels in a few minutes. History: Accepted by Andrea Lodi, Area Editor for Design & Analysis of Algorithms–Discrete. Funding: This work was supported by the National Research Foundation of Korea (NRF) funded by the Ministry of Education [Grant 2014R1A1A2058513].

供应链管理生产计划运筹优化动态规划