共享供应源的两个混合系统的集成战术连续生产规划:以磷酸盐供应链为例

Integrated tactical continuous production planning of two blending systems sharing supply sources: the case of a phosphate supply chain

International Journal of Production Research · 2024
被引 1
ABS 3

中文导读

研究了全球最大磷酸盐生产基地的战术生产规划问题,提出一个集成模型,通过动态混合和路径选择确保产品质量,同时优化成本,适用于多矿种混合的矿业场景。

Abstract

This paper deals with a problem of tactical planning of production activities. It considers the case of the world's largest phosphate production site, with several mines, several washing plants, and a drying plant, with transport of merchantable phosphate ores (MOs) by rail or pipeline. The tightening of product quality requirements by customers prevents from continuing to plan its production with the current rules. Currently, the plants are managed quite independently, source ores (SOs) are pre-assigned to the MOs for blending, and the MO production routings in the washing plants are predetermined. We propose a model that ensures flexibility in the production of MOs through the choice of dynamic blends and routings. Our approach goes beyond any pre-allocation of resources and aims at synchronising the flows of the washing plants. This specific problem of blending production and planning has not been addressed in the literature. Still, it is widely encountered in many mining industries and offers perspectives for the application of the approach proposed. Numerous tests show that this model ensures the quality constraints related to the composition of several chemical components, with a generalised use of the most economical routings while ensuring horizontal and vertical alignment of decisions.

供应链管理生产计划运营管理矿业工程混合生产