重新调度以在原始作业的全局中断与新作业的灵活性和调度成本之间进行权衡

Rescheduling to trade off between global disruption of original jobs with flexibility and scheduling cost of new jobs

Omega · 2024
被引 5
ABS 3
运营管理调度优化生产调度运筹学