基于局部分支的多期下料问题解决方案,考虑延迟、提前和设置成本

A local branching-based solution for the multi-period cutting stock problem with tardiness, earliness, and setup costs

Journal of Heuristics · 2025
被引 1
ABS 3
运筹学生产调度库存管理数学优化